When it comes to construction work, safety is paramount. One of the most important tools to ensure safety on construction sites is the Safe Work Method Statement (SWMS). This document plays a critical role in managing risks and protecting workers from harm. But what exactly is a SWMS, and why is it so important?
What is a Safe Work Method Statement (SWMS)?
A Safe Work Method Statement (SWMS) is a document that outlines the high risk construction work activities carried out on a project. It provides a detailed plan for performing each task safely, ensuring that all risks associated with the task are identified and controlled. The SWMS serves as both a guide and a safety tool, laying out step-by-step procedures, risk controls, and emergency measures for the activity being undertaken.
In Australia, Safe Work Method Statements are a legal requirement for high risk construction work (HRCW) activities defined in the relevant WHS/OHS Regulations, which are legislated by the individual state and territory regulators. These statements are crucial for managing risks and ensuring that workers are trained and aware of potential hazards before work begins.
Why is a SWMS Important for High Risk Construction Work Activities?
High risk construction work activities carry significant potential hazards that can lead to severe injury or even fatal accidents. These tasks, such as working at heights, operating powered mobile plant, dealing with hazardous chemicals that may have a contaminated or flammable atmosphere, or working near energised electrical systems, can pose a threat to the safety of workers if not managed properly. This is where a SWMS becomes essential.
For HRCW activities, a SWMS ensures that risks are clearly identified, controlled, and managed in a systematic manner through the use of the hierarchy of controls.
Hierarchy of Control
Control measures can be ranked from the highest level of protection and reliability to the lowest. This ranking is known as the hierarchy of control. The higher order controls must always be considered first.
- First, eliminate risks by eliminating hazards; this is the most effective control measure
- Then substitute hazards with something safer, isolate hazards from people and/or use engineering controls to minimise any risks that have not been eliminated
- Then use administrative controls to minimise any remaining risks, and
- Then use personal protective equipment (PPE) to minimise any risks that remain.
Depending on the state or territory, there are 18 or 19 high risk construction work activities that require a SWMS. For these activities, a SWMS is not just a regulatory requirement, but a critical tool in ensuring the safety of everyone on site.
Conclusion
A Safe Work Method Statement (SWMS) is vital for managing high risk construction work activities, ensuring the safety and well-being of workers. By identifying hazards, implementing control measures, and providing clear work instructions, a SWMS helps minimise the risk of accidents and injuries.
Download a free support services document.
It includes available support services and resources for employees, such as counselling services, and peer support networks to access when needed.
Just fill out the form and we will email it to you.